How to complain to your landlord about damp and mould
Last reviewed: 10 November 2026
Report damp and mould to your landlord promptly, describe the affected rooms and health concerns, and ask for an investigation and repair plan. In England, social tenants have specific Awaab's Law deadlines, while private tenants should pursue the landlord and, where necessary, the council's housing or environmental health team; the English private renting extension is not yet in force on 10 November 2026.
Keep a written record even if you initially report by phone. You do not need to buy measuring equipment or obtain a medical letter before the landlord should take your report seriously. If the situation is dangerous, use the landlord's emergency reporting route as well as the complaint process.
1. Describe the problem and its impact
Give your address, when you first noticed the problem, where it appears and whether it returns after cleaning. Mention leaks, damaged gutters, heating faults or ventilation problems you have observed, without claiming to know the cause if you do not.
Explain relevant household circumstances, such as young children, disability or an existing health condition, so the landlord can assess the risk. Government guidance recognises that damp and mould can harm health and says landlords should identify and address the underlying causes, rather than simply blame a tenant's lifestyle.
Take dated wide and close photographs. Keep the original images, copies of reports and a list of visits, cancellations and work done. Photograph damaged belongings and retain receipts if you later seek reimbursement.
Temperature or humidity readings may add context, but a particular reading does not prove a structural defect or establish legal responsibility. Ask for a competent assessment of the cause. A complaint should explain the evidence you have, rather than promise that one measurement defeats every possible explanation.
2. Check Awaab's Law for English social housing
Phase 1 came into force on 27 October 2025. It covers significant damp and mould hazards and all emergency hazards in the social rented sector. The landlord's awareness of the possible hazard matters; the clock does not wait for a formally labelled complaint.
The current Phase 1 guidance sets out these principal requirements:
- Investigate a potential significant hazard within 10 working days of becoming aware of it.
- Provide the investigation summary within three working days of the investigation ending, subject to the guidance's limited exception where the necessary work is completed promptly.
- Complete relevant safety work within five working days of the investigation concluding where a significant hazard is found.
- Investigate and complete relevant safety work for an emergency hazard as soon as reasonably practicable, within 24 hours of awareness.
These are not interchangeable with the complaint response deadlines. Nor does the five-day rule simply mean starting any repair after sending a report. Safety work must make the home safe; further preventative work has separate requirements, including steps within five working days and a physical start as soon as reasonably practicable, within 12 weeks, with completion within a reasonable time.
If the relevant safety work cannot be completed in time, the landlord must secure suitable alternative accommodation at its expense. Ask how the proposed accommodation meets your household's needs and what will happen while the work continues. The detailed guidance includes scope limits, exceptions and a reasonable-steps defence, so do not assume every patch of mould automatically establishes a breach.
3. Distinguish forthcoming changes
English social housing Phase 2 is due on 30 November 2026, after this review date. It extends significant-hazard requirements to excess cold and heat, falls, structural collapse, fire and explosions, electrical hazards and domestic hygiene. Phase 1 already covers emergency hazards of all types.
The Renters' Rights Act 2025 provides for extending Awaab's Law to English private renting, but detailed requirements and commencement still need regulations. The October 2026 consultation is considering implementation; do not apply the social housing deadlines to a private landlord as if they already govern that tenancy.
Scotland has separate rules effective from 6 October 2026 for relevant social and private tenancies, including investigation within 10 working days, a summary within three and commencement of repairs for substantial damp or mould within five working days of the investigation concluding. Wales and Northern Ireland have separate housing law and complaint arrangements; the English timetable does not apply there.
4. Escalate through the right route
For an English social landlord, raise dissatisfaction through its complaint procedure while continuing to request the repairs. Ask for a complaint reference, the issues being considered and the response date. Escalate an inadequate answer to stage 2, then approach the Housing Ombudsman; it can also help when the landlord is failing to respond.
See our Housing Ombudsman guide for the Code's separate acknowledgement, response and extension rules. A final complaint answer can arrive before repairs finish, so keep tracking promised actions and report any deterioration.
For private renting in England, send the report to the landlord and managing agent where appropriate. Ask when inspection will happen and how urgent risks will be addressed. There is no universal 14-day inspection allowance covering every private repair problem.
If the response is inadequate, ask the council's private housing or environmental health team to assess the conditions. Provide your reports, photographs and any risk information. The council decides what inspection and enforcement action is appropriate; making a complaint does not itself guarantee a particular notice.
An agent's failure to pass on reports or manage agreed repairs may also be a service complaint to its redress scheme. That is separate from enforcing the landlord's repair duties: see letting agent complaints. Continue paying rent while the repair dispute is addressed.
5. Understand eviction protection and new services
For English private assured tenancies, section 21 was abolished on 1 May 2026. The old advice about obtaining a council notice to secure a six-month bar on a new section 21 notice is therefore not the current protection to rely on. Landlords must use an applicable possession ground and the required legal process.
Complaining is not a blanket guarantee against possession on a genuine legal ground. Earlier section 21 proceedings may remain relevant where a valid pre-May notice was used and court proceedings began by the transitional deadline, no later than 31 July 2026. Obtain prompt housing advice about any notice or court papers.
The new private landlord ombudsman is expected in 2028, and is not open for these complaints now. The database rollout starts in the West Midlands on 15 December 2026; a registration system is not itself a repair complaint adjudicator. Do not wait for either reform to report unsafe conditions.
For help arranging your evidence and writing a focused complaint, visit our contact form or housing page. ComplaintAdvocate offers paid preparation and complaint management; you can report problems and use the available public complaint routes yourself for free.
Frequently asked questions
Does Awaab's Law already cover private landlords in England?
No fixed English private renting timetable is in force at this review date. The extension is being consulted on, while existing repair and safety duties continue.
Must I prove mould caused an illness?
You should report the mould without waiting for medical proof. Explain health concerns and household vulnerabilities so the landlord can assess urgency.
Can I stop paying rent until repairs are done?
Continue paying rent while pursuing the problem. Get individual advice before taking action that could create arrears or affect your tenancy.
Can the landlord just paint over mould?
Ask how the proposed work deals with the cause and prevents recurrence. Record if mould returns and request reassessment rather than treating a cosmetic visit as proof the issue is resolved.
Sources
- GOV.UK, current social housing Phase 1 requirements: https://www.gov.uk/government/publications/awaabs-law-guidance-for-social-landlords/awaabs-law-guidance-for-social-landlords-timeframes-for-repairs-in-the-social-rented-sector
- GOV.UK, Phase 2 scope and date: https://www.gov.uk/government/publications/awaabs-law-phase-2-guidance-for-social-housing-landlords/awaabs-law-phase-2-guidance-for-social-landlords
- GOV.UK, private renting consultation: https://www.gov.uk/government/consultations/extending-awaabs-law-to-private-rented-tenancies-and-to-licences/extending-awaabs-law-to-private-rented-tenancies-and-to-licences
- GOV.UK, damp and mould guidance: https://www.gov.uk/government/publications/damp-and-mould-understanding-and-addressing-the-health-risks-for-rented-housing-providers/understanding-and-addressing-the-health-risks-of-damp-and-mould-in-the-home--2
- GOV.UK, repairs and council action: https://www.gov.uk/private-renting/repairs
- Commons Library, tenancy reforms: https://commonslibrary.parliament.uk/research-briefings/cbp-10669/
- Kingston Council, section 21 transition: https://www.kingston.gov.uk/housing/landlords-and-private-sector/renters-rights-act/no-fault-evictions
- GOV.UK, database rollout: https://www.gov.uk/government/news/stronger-protections-and-greater-confidence-for-renters
- Scottish Government, separate damp and mould rules: https://www.gov.scot/publications/awaabs-law-guidance-landlords-scotland/pages/2/
- Housing Ombudsman, referral help: https://www.housing-ombudsman.org.uk/residents/when-to-get-help-from-the-housing-ombudsman/